Ankeny Facility Construction & Remodeling Updates
  Ashland Area Elementary Site
Ashland Const. 4
October 12, 2007
Piping to be placed inside masonry walls
for future student restrooms.
Ashland Const. 5
October 12, 2007
Granular fill being made ready for
placement under classroom floors.
Ashland Const. 2
October 12, 2007
Steel framing being placed in masonry wall for future window. Approximately 1,100 concrete blocks are placed each day.
Ashland Const. 3
October 12, 2007
First installation of structural steel to support
future gym/lunchroom connection.
New Elementary Site Photo 1
October 2007
Drilling of the geothermal wells is nearing completion.
Ashland Const. 1
October 12, 2007
Plumbing and concrete floors for future classrooms.
New Elementary Site 2
September 2007
Concrete block walls being constructed to
enclose classrooms and other spaces.
Elementary Photo 7
September 2007
Layout of underground systems: water lines,
electrical and sewer are being completed
before footings are installed.
Elementary Photo 5
Footings and walls are going up as
the building takes shape.
Elementary Photo 6
September 2007
Concrete footings with reinforcing bars are ever
expanding with most of the floor print being completed.
Elementary Photo 3
August 2007
Geothermal loops down 200' in each well will eventually
be connected together to heat and cool the building.

Elementary Site Photo 4
Drilling rig preparing to drill geothermal wells
for new heating and cooling system.
Approximately 220 wells will be drilled for this system.

Groundbreaking
June 4, 2007
Groundbreaking Ceremony for the New Elementary
School in the Ashland Meadows Area.
Picutred above are the School Board Members,
Interim Superintendent, Incoming Superintendent,
and the Mayor of Ankeny.
Elementary Photo 9
July 2007
The new elementary, located in Ashland Meadows,
in the beginning stages of grading and earth moving.
2007 Summer Projects
Roof
Westwood Elementary had several levels of
roofing replaced during the summer of 2007.

 

Playground
All elementary school playgrounds received a fresh
covering of wood mulch in the summer of 2007.
Terrace Elementary 2007 Summer Projects
Major renovations were completed at Terrace Elementary in the summer of 2007. These included: new heating/cooling system using geothermal, upgraded domestic water system , new ceilings and lights, and new bulletin and white boards were installed.
Terrace Photo 1
Terrace Photo 3
Terrace Photo 4
Terrace Photo 5
Terrace Photo 6
Northview Middle School Tennis Courts completed in the Spring of 2007 in cooperation with the City of Ankeny.
Terrace Photo 7
Terrace Photo 8
Terrace Photo 9